Unitron MEC2 Especificaciones Pagina 9

  • Descarga
  • Añadir a mis manuales
  • Imprimir
  • Pagina
    / 18
  • Tabla de contenidos
  • MARCADORES
  • Valorado. / 5. Basado en revisión del cliente
Vista de pagina 8
MEC2 INVERTED METALLURGICAL MICROSCOPE
UNITRON
®
73 Mall Drive, Commack, NY 11725 • 631-543-2000 • www.unitronusa.com 9
Connecting the Power Cord
(Figures 12, 13 & 14)
The electric cord should never be bent,
twisted, crushed or subjected to stress.
1. Set the main switch① to “O” (off) before
connecting the power cord.
2. Insert the power cord into the receptacle②.
3. Insert the BNC cord plug (3) into the BNC
connector (4).
Ensure the power cord is connected to a
properly grounded electrical outlet.
Replacing the Fuse (Figures 12 & 13)
Ensure the main switch① is set to “O” (Off) and
the power cord is disconnected before replacing
the fuse. With a flat-head screwdriver, remove
the fuse holder (5), replace with a new fuse,
then re-install the fuse holder.
Fuse rating: 250V, 500mA
Connecting the Power Cord
(Figure 14)
Insert the power cord (6) into a properly
grounded 3-prong electrical outlet (7).
Fig. 12
Fig. 13
Fig. 14
Vista de pagina 8
1 2 3 4 5 6 7 8 9 10 11 12 13 14 ... 17 18

Comentarios a estos manuales

Sin comentarios